Greggs Eco Drive-Thru, Winchester
Project Overview
The Eco Drive-Thru project, launched by Greggs, was the first of its kind within the organisation. Building on the success of their first Eco-Shop, the drive-thru was designed to deliver the same quality service for customers and become a testbed for eco-initiatives. The project specification stated that the building would be occupied by both customers and staff and housed 3 WC units.
As part of The Greggs Pledge, the goal was to test systems that could be rolled out across 25% of their estate and, for this project, that was achieved through the installation of a rainwater harvesting system, solar panels, sun tubes, and efficient heating and cooling systems.
Roof Area
Applications
Tank Size
Local Annual Rainfall
The Solution
Stormsaver was commissioned to provide the rainwater harvesting system. The system needed to overcome two key challenges: limited site space, and the client’s desire to make sustainable practices visible to customers.
Our design team developed the solution by supplying a StormStation system, a compact, all-in-one unit which contained every essential component, including a 3,000-litre storage tank, pre-tank filters, booster set, and a control panel. This “plug-and-play” system enabled quick installation, saving the client both time and labour costs.
The system provided significant water savings, while also serving as a clear and visible demonstration of the client’s commitment to sustainability.