About our Installation Services

What's Included

Final Connections

We will complete the final electrical and pipework connections to your system. This is often the most complex stage of installation and is carried out within a 5 m² area (L 5 m × W 5 m × H 2 m).

UV Installation

We will install the UV disinfection unit as part of the rainwater harvesting or greywater recycling system, ensuring correct integration and optimal performance.

Cotton Wound Filters

We will install any cotton wound filters required for your system. These filters are frequently installed incorrectly on the wrong pipework by installers unfamiliar with water reuse systems, which can affect performance and compliance.

Submersible Pumps

We can provide full installation of the mechanical and electrical components for submersible pumps located within the main storage tank.

Sectional Tanks

We can complete the on-site assembly of sectional storage tanks for rainwater harvesting systems. Please note that this service applies to above-ground sectional tanks only and does not include below-ground installations.

Example Scope of Works

Below are example schematics illustrating the typical scope of our installations. The coloured sections highlight the areas covered by our Hand-Selected Install Partners, showing exactly what our installers handle on site.

rainwater harvesting installation diagram scope of works

Protecting Your Project Timeline. Reducing Your Costs.

Designed for M&E Contractors

Predictable Timelines

Access our Hand-Selected Installers and secure specialist support exactly when you need it. No scrambling for availability. No programme uncertainty. Just experienced installers who understand our systems

Lower Costs

Our installers work with water reuse systems day in, day out. That familiarity translates into faster installations, efficient on-site coordination and fewer return visits. You benefit from reduced labour time and consistent quality

Less Complexity

Water reuse systems require specific mechanical and electrical knowledge. When unfamiliar engineers are left interpreting technical requirements on site, projects can slow down and pressure builds across the wider team

Fewer Aborted Visits

Incorrect installations can prevent systems from being commissioned, leading to additional costly visits and project disruption. By working with installers who know our systems inside out, you dramatically reduce the likelihood of commissioning delays

Hand-Selected. Thoroughly Trained

The Story Behind our Hand-Selected Install Partners

The way we source and select our Installer Partners should give you complete confidence that they share the same values of trust, expertise and quality that you know and expect from Stormsaver.

We do not actively seek new contractors to join our Network. Instead, we hand select partners we have previously worked with on live sites alongside our clients, where we have seen first-hand the standard of their workmanship and their technical expertise in the field.

Once we believe there is a strong alignment, we carefully vet their sustainability practices, ethics and financial stability to ensure they are fully equipped to deliver the same high level of service that defines Stormsaver.

Finally, every new Approved Installer undertakes comprehensive training on our systems. This ensures they understand system nuances, common installation issues identified from previous projects, and current best practice guidance. Training is delivered by our in-house team of Contracts Engineers, who bring years of hands-on experience installing, commissioning and maintaining water reuse systems themselves.

Get Your Cost-Saving Quote
Card Image

FAQs

Got A Question?

How does your Installation Services Work?


Our Proven Process for a Quality Installation

A clear, structured approach from enquiry to commissioning.

  • YOU – Get in touch with our team to discuss your project requirements.

  • YOU – Confirm that you would like a quotation for the supply and installation of your water reuse system.

  • US – Our Technical Estimating Team prepares a detailed quotation, involving a dedicated Contracts Engineer at proposal stage to ensure technical accuracy from the outset.

  • YOU – Complete a short site information form so we can understand specific site conditions and define an accurate scope of works.

  • US – Issue two clear quotations: one for system supply and one for installation via our Approved Installer.

  • YOU – Raise Purchase Orders for the agreed works.

  • US – Project manage the process from this point forward, including scheduling and coordinating all required site visits.

  • US – Complete the installation through our Approved Installer Network.

  • US – A Stormsaver Commissioning Engineer carries out full system commissioning and provides a detailed commissioning report for your records.

Why This Isn’t an In-House Service

We’ve structured our installation services in this way to ensure every project reflects our core values of quality, unrivalled expertise and a customer-orientated approach.

This model benefits our valued customers directly. By taking advantage of our carefully selected Approved Installer Network, we can deliver faster lead times, greater flexibility, and cost efficiencies through economies of scale. The result is a smoother, more predictable project for you, and confidence that every installation meets the high standards you expect from Stormsaver.

Can You Install Underground Tanks?

No – our installation services do not cover the installation of below-ground equipment, including tanks and associated interconnecting pipework. We also do not cover any associated power and control cables between the storage tank and the plant room housing the system’s equipment.

What we can provide is the connection of submersible pumps within below- or above-ground storage tanks. This includes installing the required pipework and electrical connections to the tank’s incoming pipework, ensuring a fully integrated and compliant system.

Is This Service for Both Rainwater Harvesting and Greywater Recycling Systems?

Yes – our installation service covers rainwater harvesting and Smart SuDS Systems.

Can You Deviate from the Scope?

Our typical installation parameters are designed to cover the main requests from Mechanical and Electrical Contractors. In addition, we can also provide bespoke offerings upon request on a site-by-site basis for an additional charge.